Architecture Magazine and Design. Powered by Blogger.


Saturday, September 7, 2013

Design Stadium for Olympiade 2020 in Yokyo, Madrid and Istambul

finally hearing International Olympic Committee (IOC) decided to Tokyo to host the 2020 Summer Olympics. The announcement of the results of the IOC meeting in Buenos Aires, Argentina, Saturday (09/07/2013). Tokyo had doubted could win the competition against Istanbul and Madrid, with consideration of security reasons. However, the delegation led by Princess Takamado, managed to convince many members of the IOC, that Japan is now in a safe and stable condition to host the biggest sporting event in the world.
Japanese Prime Minister Shinzo Abe led a delegation to attend the voting Tokyo Olympics 2020 determination. Japanese Prime Minister Shinzo Abe is optimistic that the Fukushima nuclear power plant leaks will not threaten Japan's offer to host the 2020 Olympics. "Ongoing radioactive leak at Fukushima nuclear plant will not threaten Japan's offer to host the 2020 Olympics," said Abe
The presentation was very emotional and Tokyo representation has attracted a lot of noise, which makes Madrid directly eliminated in the first round of voting. Madrid run for the third time in a row.
Prior to this, Tokyo has never hosted the Summer Olympics in 1964. Japan was also the host of the Winter Olympics, in Nagano in 1998. Tokyo run for a fourth time, with two unsuccessful attempts in 1960 and 2016. Strongest candidates for hosting the Olympics in 2020, Tokyo, plans to build the biggest athletes village last 42 years. This is a strategic move that may benefit developers classmates giant Shimizu Corp and Mitsubishi Estate Co..
Residential complex for sportsmen universal feast will cost about 985 million U.S. dollars (USD 10 billion) and occupies an area of ​​44 acres, right next to Tokyo Bay. Kenichi Kimura, Tokyo Metropolitan Government finance officials who initiated the nomination, said separately plans to allocate 153.9 billion yen (USD 15.6 billion) for new construction and renovations at 11 locations.
The athletes' village land area 28 percent larger than the Disneyland Park in California and will be the largest in Tokyo since 1971 when a city-scale housing projects, Tama New Town, built on the western outskirts of the capital city.
According to the Bureau of Urban Development Tokyo, Tama New Town, which is located about 25 kilometers (16 miles) from Tokyo city center and covers 2,853 acres, is the largest city-scale housing development in the City of Sakura. The new city was planned in the mid-1960s to address urban migration to the capital. The residents arrive in early 1971.
"The impact of the construction of the athletes' village will be extraordinarily significant and very positive for the property market. Construction companies are also expected to realize the government's investment and in turn have an impact on the growth of the value of the land," said analyst at Deutsche Securities Inc., Yoji Otani. Tokyo Olympic bid committee plans to select a developer to build the athletes' village in mid-2014, with the design and construction work began later that year.

 n addition to building the athletes' village, Tokyo also will work on a modern stadium with a capacity of 80,000 seats with a roof that can be opened and closed automatically. As a designer, selected architect Zaha Hadid is a celebrated winner of the Pritzker Architecture Prize.

The Olympic stadium is done on the site of the 1964 National Olympic stadium will be demolished as soon as Tokyo was chosen to host. So that when the time comes, when the stadium construction work completed, can be used as a Rugby World Cup venue in 2019, before the Olympic Games held in 2020. Tokyo plans to select a developer to build a stadium in October 2014, with construction beginning one year later. The Government has not decided what to do if Tokyo fails elected.





Read more >>

Friday, March 23, 2012

Adaptable architecture gallery in london

The water pipeline - could be a system that allow the large quantity of water through. With the lapse of your time it becomes blocked, therefore, for cleaning the drains we have a tendency to use a plunger. Human being - is additionally the system that allow through the large quantity of data. Human`s mind becomes blocked by this data just like the drain creating perception of the planet narrower and a lot of prosaic.
“Urbanplunger” - is that the gallery that may pump the human`s mind and unleash place for the new suggestions and experiments. one amongst the most shaping components of the gallery could be a “piece of a city”. the town - could be a receptacle of architectural ideas and achievements, structure where the most processes of human’s life are happening. Having found out the “plungers” on the highest of the “gallery - piece of the city” we have a tendency to pump the visitors` perception up. 



Walking through the dock and companion ladder, guests seem on board of the floating gallery. within the center there's a main lobby with cafeteria, storage area and bogs. From the lobby they'll get into the permanent exhibition area and into the temporary exhibition area that are situated below the “plungers”. The “plungers” are made up of the clear material that build comfy lighting within. one amongst the “plungers” has an observation terrace. so as to induce on the roof guests will use internal ramp. There are hydraulic elevators within the “plungers” that compress and stretch the constructions out.

location: London, England 
program: London 2008. Adaptable architecture gallery 
type: International competition
Read more >>

Thursday, March 22, 2012

Adult Night club Hotel with Green Space

According to existing scenario with extraordinarily compact coming up with we've got got a thought of pendant design. we have a tendency to elevated our object over the bottom stripped the duvet "rind" down and leant it on the closest buildings making the load-bearing frames. This spatial structure just like the jet wings let the total building soar in area. Due to such style we have a tendency to created a inexperienced sq. beneath the building and increased the territory of existed recreation zone. 
Visually and functionally our building consists of 3 parts:
  •  Nightclubs. all-time low a part of the building. 
  • Public multi leveled lobby with security access to hotel.  Spa center with semi-Olympic swimming pool, business center , store, restaurant and etc. The central a part of the building horizontally developed.
  • Hotel. The higher a part of the building. All slabs have regular define with declining fringe of  filler structure towards the higher stores. This produce a chance to form balconies in single and double rooms and terraces in suites, aerial villas and in presidential suite.


 This soaring style for an evening club and hotel by jap European firm Urbanplunger was awarded third prize within the international competition for a website in Hong Kong, China.  Given the extraordinarily compact urban panning that already exists on the location, Urbanplunger used the thought of “pendant design,” by hanging the hotel and night club higher than the bottom.




This allowed the bottom beneath it to be detached as recreational inexperienced area among the tightly-knit town.  Also, drawing upon the sensuality prompt by the night club, the outer layers of the building concept were “stripped” down (hence the look concept’s name, “Let Me See You Stripped”), turning into airplane-like wings on prime of neighboring buildings that support the burden of the hanging structure.

Project team: Tatsiana Keskevich , Alexander Kuzmianchuk, Eugene Liashuk.
location: Hong Kong, China 
project: Adult night club hotel
type: International competition
Read more >>

Indonesia job

 

©  3 column Minima Template by Bloganol