Architecture Magazine and Design. Powered by Blogger.


Showing posts with label norman foster. Show all posts
Showing posts with label norman foster. Show all posts

Friday, July 22, 2011

Amazing of Samitaur Tower

Conceptually, the tower has both introverted and extroverted planning objectives. Internal to the burgeoning site area of new media companies, graphic designers, and general office tenants, the tower will symbolize the advent of this important new urban development, provide a changing art display for local viewing, and offer a variety of graphic content and data on its five screens concerning coming events and current achievements of the tenants who occupy that part of the city.

     The Samitaur Tower is an information tower, constructed at the corner of Hayden Avenue and National Boulevard immediately across from the new Expo light rail line arriving from downtown Los Angeles in June, 2011. That intersection is the primary entry point into the re-developed zone of Culver City.

    Externally, the tower displays culturally significant content and local event information, along with art and graphic presentations of all sorts available to in-car audiences who pass the site area, traveling on a number of local thoroughfares in the Culver City / West Los Angeles area. In addition to the large number of cars passing the site, the Expo Line has an estimated ridership of 30,000 passengers per day with two local stops several blocks east and west of the site. The presence of the train riders guarantees an enormous daily audience of Tower art viewers, as well as an increase in pedestrians in the area, who will walk past the Tower from the train stops to local businesses.


  All the buildings in the immediate area are governed by a 56 foot height limit. The Samitaur Tower height is an important exception to the local height rule. The project is 72 feet high, measured from grade, and includes an open-air, excavated, concrete seating and staging space at its base that begins at minus 12 feet, and housing for all the electronic and media related equipment for the Tower.

 The tower consists of five circular steel rings, approximately 30 feet in diameter. The rings are stacked vertically at 12 foot floor-to-floor intervals, and, as the height increases, the rings are staggered in plan, back and forth – to the north, east, south, and west – in order to establish proximity and viewing angles for various levels at various heights. Projection screens at each floor are to be seen from cars on surrounding surface streets, from freeways, by passengers at train stops, from on-board the moving trains, and from area pedestrians at a variety of key walking and viewing points. Between each pair of staggered horizontal circular steel planes, the curving, conical projection screens are installed. Behind the screens, hung from the tower floors are a number of digital projectors, 10 in all, that will rear-project onto the translucent acrylic screens.

    Inside the screens, steel decks are provided for viewers to look out at the city, and for a maintenance staff who will service the projectors and screens.

    The Tower has a glazed elevator in an enclosed glass shaft, and an open stairway to the top, so the Tower will be used as a viewing platform to overlook the city, but its primary objective is to distribute art and other relevant content to the local and the in-transit audiences passing by.

  
  There are several target audiences that account for the positioning of the five screens. First is the traffic on the Santa Monica Freeway, several blocks to the north, one of the most highly trafficked freeway routes in Los Angeles. Second, the intersection of La Cienega Boulevard and Jefferson Boulevard, several blocks from the site, another of the highly trafficked intersections in the city, and the location of the primary new, elevated train stop. Third is the corner of Hayden and National itself, adjacent to the project, which is also a signaled, highly trafficked east-west route. Finally, there is one screen, just above grade level, that, unlike the other four, faces the re-development site. That screen will be used by local audiences, seated on the terraced concrete bleachers that step down to the below grade portion of the project where a stage for speakers and performers is provided.
Read more >>

Wednesday, December 15, 2010

Zayed National Museum in Abu Dhabi

the design of the museum aims to combine a highly efficient, contemporary form with elements of traditional arabic design and hospitality to create a museum that is sustainable, welcoming and culturally of its place. featuring a landscaped garden around its base, the museum's display spaces are housed within a man-made mound. the interior conditions are regulated passively through five solar thermal towers, which host the galleries. the towers heat up and act as thermal chimneys, drawing cool air currents throughout the museum. fresh air is captures at the low level and drawn through buried ground-cooling pipes and then released into the museum's lobby. air vents open at the top of the wing-shaped towers taking advantage of the negative
pressure on the lee of the wing profile to draw the hot air out.

foster + partners' designs for the 'zayed national museum' in abu dhabi was revealed by his highness sheikh mohammed bin rashid al maktoum, vice-president and prime minister of the UAE and ruler of dubai and her majesty queen elizabeth II of the united kingdom. conceived as a monumnet and memorial to the late sheikh zayed bin sultan al nahyan, the founding president of the UAE, the museum will be the centrepiece of the saadiyat island cultural district and will showcase the history, culture and more recently the social and economic transformation of the emirates
balancing the lightweight steel structures with a more monumental interior experience, the galleries are anchored by a dramatic top-lit central lobby, which is dug into the earth to exploit its thermal properties and brings together shops, cafes, and auditorium and informal venues for performances. throughout, the treatment of light and shade draws on a tradition of discreet, carefully positioned openings, which capture and direct the region's intense sunlight to illuminate and animate these interior spaces

architect :foster + partners team: norman foster, david nelson, gerard evenden,
toby blunt, marin castle, ross palmer, dara towhidi, karsten vollmer,
barrie cheng, ho ling cheung, sidonie immler, joern hermann, nadrew king,
gemma owen, jillian salter, marilu sicoli, daniel weiss, bram van der wal, simon wing

source: designboom

Read more >>

Friday, November 26, 2010

Masdar City Green,UAE

Announced in April 2006 and launched in February 2008, the construction of a city some 100% ecological kilomètresd'Abou Dhabi begins to take shape.
Called "Masdar, which means" source "in Arabic, the city will cover 6 square kilometers and is expected to accommodate 50,000 inhabitants and 1,500 businesses.
The key measures that will help make this city really green.The cost of this 100% eco-city will be reduced from 10 to 15% compared to original estimates of 18.7 to 19.8 billion instead of $ 22 billion.

Energy, Water & Recycling
A photovoltaic power and solar panels on the present buildings will produce the main source of electricity. The expected production is 100 MW and is expected eventually to reach 500 MW. Part of renewable energy will still be produced outside of the city.
Desalination plants that run on solar energy will fuel the city's drinking water. The entire wastewater used to irrigate crops for biofuels or for food, or to water parks.
Architecture
To avoid the use of air conditioners, electricity guzzling, the city will be surrounded by walls to block the hot winds and sand. The streets were laid narrow to emphasize the shadows, and oriented to maximize air circulation.
The walls of the institute of science and technology are isolated by large rubber pads that return the sunlight and to mitigate the effect. The library has windows that prevent sunlight from entering the building. Its roof is in turn covered with solar panels. Electric vehicles are being tested.

Transportation
Car traffic will be prohibited within the city. For short trips, pedestrians and cyclists will be encouraged. For longer trips, various means of transport will be deployed. The PRT (Personal Rapid Transit, understand "personal rapid transit"), rapid transit and light that looks like a mini electric streetcar, moves to the request within the city. Its cabins, accommodating 1-10 people can be called at the touch of a button at each station (spaced a maximum of 200m). The shortest route will be chosen depending on traffic.




Where is the project?
The project was originally scheduled to be completed by 2016. But his promoter announced Sunday that it would not happen before 2020 or even 2025. To date, only the construction of the institute of science and technology is complete. Just over 170 students are present, including one hundred who lives on campus.

architect: Foster + Partners
Read more >>

Indonesia job

 

©  3 column Minima Template by Bloganol